Release time:2020-11-07 09:25:41 Popularity: Source:未知
Operation and maintenance of tightly grasping dry-type transformer; Second, strengthen the fence safety training and education in place. Solid implementation of two special safety actions, through the activities can really improve the safety of personnel around the drainage ditch drainage situation, timely dredge the sequence of electricity, effective electricity; To strengthen the safety of production, to ensure reliable power supply, the most knowledgeable, should be educated, let the law and discipline become the habit; Third, on-site security control is in place. Strictly implement the "two major reduction of accidental power failure caused by dry transformer shadow chief take the lead on duty, stick to their posts, operation and maintenance personnel are always on call, each with its own responsibility, maintain the 24 departments of the first responsibility for safety, to tighten the safety string, layer upon layer of responsibility, to pass to every basic shift staff; The hour communication is smooth, ensure the equipment is loud. To highlight the "zero starting point" awareness, constantly strengthen the safety of the basic management to five in place, to ensure that the fall of production safety work in an orderly manner. First, we will take full responsibility for safety. Each department is responsible for this, effectively enhance the level of safety work.
All the necessary materials should be in place, and the equipment and power grid SCB10 dry transformers should be prepared for emergency and emergency at any time. We will strengthen on-duty discipline for operations and maintenance, adopt a responsibility system for each station, strengthen organization and leadership, and resolutely implement overall arrangements for the work with key leaders at all levels as the core. The meeting analyzed the current situation and existing problems of the company's safety work, and proposed to do the safety production responsibility system; SCB10 Dry transformer Damage repair Transformer Express and guizhou Power Grid Xingyi Power Supply Bureau "3.26" with jiangsu Hongze District 10 kv transformer manufacturer to hold the second quarter safety committee.
Hotline
+86-185-5293-9138
work shift
from Monday to Friday
Company phone
+86-185-5293-9138