(1) transformers operating at full load all day are not suitable for overload operation. (2) when the transformer is operating at low load, the overload condition and duration allowed by the transformer peak load are strictly limited. (3) lo
After repair, long-term off or standby transformers, before putting into operation, the need to measure insulation resistance. Transformer Insulation Resistance Value Provisions: (1) with the last measurement results, shall not be less than
SCB10-2000KVA干式变压器尺寸每个厂家生产的都或多或少有些差异,因为图纸不同,另外产品也因适应市场在不断升级更新。小编提供一下力王电气的2000KVA干式变压器尺寸给大家,1150*17
1. Check before power transmission, work ticket termination, restore to pre-maintenance safety measures. Open the gas relay vent valve, vent the gas, close the valve. Cooler power input, cooler operation is normal. Transformer oil level is n
1, gas protection device operation, normal operation, heavy gas protection pressure plate throw trip position, light gas protection throw signal position. Under special circumstances, the pressure plate of heavy gas protection should be chan
Hotline
+86-185-5293-9138
work shift
from Monday to Friday
Company phone
+86-185-5293-9138