Matters needing attention in transformer overload operation

Release time:2021-03-26 14:26:03 Popularity: Source:未知

(1) transformers operating at full load all day are not suitable for overload operation. (2) when the transformer is operating at low load, the overload condition and duration allowed by the transformer peak load are strictly limited. (3) low load in summer, suitable overload operation in winter, within 15% overload. (4) under normal circumstances, the overload of oil-immersed self-cooling and oil-immersed air-cooled transformers shall not exceed 30% , and that of forced oil circulation air-cooled or water-cooled transformers shall not exceed 20% . (5) when overload operation, all the coolers are put into operation.

High voltage ring main unit
KBSG mine flameproof dry type transformer
KSG mine general dry type transformer

Online Message

invisibility? Click changeinvisibility?
Service
Contact

Hotline

+86-185-5293-9138

work shift

from Monday to Friday

Company phone

+86-185-5293-9138

QR code
Service