Dry transformers need to be tested and maintained

Release time:2020-11-07 09:04:24 Popularity: Source:未知

    When the dry type transformer is in use, it also needs to be repaired constantly. Only in this way can the dry type transformer get better results in use, better problems can be found in time, and the fault of the latest dry type transformer can be detected timely. Dry transformer in the detection and maintenance of the time and frequency of maintenance, but also pay attention to the steps of maintenance, the following is the dry transformer plant xiaobiang and we introduce the relevant issues in detail:

  General rules for maintenance of dry transformers.

  1. Dry transformer maintenance shall be carried out on site once a year; There are two types of maintenance

  (1) Key repair: if defects are found during patrol or maintenance and endanger the safety of power supply of the equipment, rush repair or rectification shall be organized immediately; (2) General repair: non-key equipment that does not endanger the safety of power supply shall be included in the monthly repair plan after defects are found; Overhaul every 15 years.

 
 
 
The electrical inspection workshop is responsible for the maintenance and overhaul of dry-type transformers, and the equipment management department is responsible for the maintenance.
 
 
 
Refer to railway Power Management Rules for maintenance period, project and requirements of dry-type transformer. The safety measures must comply with the railway Power Safety Work Regulations to ensure the safety of persons and equipment.
 
 
 
4 dry transformer maintenance shall be carried out before repair investigation, repair inspection and repair acceptance. Understand the operation status of dry-type transformer, grasp the existing defects and determine the maintenance items. Through the repair inspection, timely find and correct the problems in the maintenance. Inspection and acceptance after repair shall be conducted by the technical responsible person group
 
 
 
Weave repair inspection personnel and equipment responsible person to participate in, and make the acceptance record. After the overhaul of the dry transformer in operation, the power transmission inspection shall be carried out, and the work can not be finished until everything is normal.
 
 
 
Dry transformer maintenance shall be recorded. The records of investigation, maintenance and inspection before repair shall be compiled into the dry transformer technical files. And do registered maintenance, for future reference.

  The above is the common dry transformer maintenance process and related frequency for your reference, for the common dry transformer you have any other questions please contact our manufacturer or concern liwang group website for detailed consultation with our technical personnel!

 
修改翻译结果
 
High voltage ring main unit
KBSG mine flameproof dry type transformer
KSG mine general dry type transformer

Online Message

invisibility? Click changeinvisibility?
Service
Contact

Hotline

+86-185-5293-9138

work shift

from Monday to Friday

Company phone

+86-185-5293-9138

QR code
Service