Oil change and boring treatment of power transformer

Release time:2020-11-07 13:45:56 Popularity: Source:未知

 

In the use of power transformer, the need to pay attention to the protection and maintenance of transformer. Similarly, there are many considerations when using power transformer. The power transformer has been shelved for a long time, its operation time is too long or other natural and man-made factors may cause the phenomenon of power transformer insulation decline, internal water inflow or oil quality deterioration. At this time, the power transformer must be replaced with oil and dry treatment.



                                                                
  1、 Oil change of power transformer

 
First lift out the body, drain the dirty oil and clean the oil tank. If there is oil on the body, it should also be flushed. After drying, inject new oil and replace all oil resistant rubber seals. Only after the test is qualified can the network be put into operation.
 
2、 Boring treatment of power transformer
 
There are many ways to dry the body. Users can use zero phase sequence drying method, eddy current drying method, short circuit drying method, oven drying method and so on. For the power transformer with large capacity and voltage of 35 kV pole, it is better to send it to the manufacturer for vacuum drying. In this way, the insulation of power transformer can be dry and complete without aging.
 
  
High voltage ring main unit
KBSG mine flameproof dry type transformer
KSG mine general dry type transformer

Online Message

invisibility? Click changeinvisibility?
Service
Contact

Hotline

+86-185-5293-9138

work shift

from Monday to Friday

Company phone

+86-185-5293-9138

QR code
Service