What operation sequence should be observed when the distribu

Release time:2021-03-26 15:00:32 Popularity: Source:未知

    When operating transformer, in order to prevent arc burn accident, to avoid load pull. When opening and closing, first pull the low voltage branch switch, then pull the low voltage main switch, and finally pull the high voltage switch under the condition of no load of the transformer. When the switch is closed, it is the opposite. It should be noted that transformer no-load operation can only be operated when the transformer is tested. Long-term no-load operation of the transformer is not allowed for no reason. Long-term no-load operation will damage the transformer.

 
In order to prevent the interphase arc short circuit caused by the effect of wind, the middle phase, leeward phase and upwind phase should be first pulled when the high voltage drop fuse is pulled. The closing sequence is reversed.
High voltage ring main unit
KBSG mine flameproof dry type transformer
KSG mine general dry type transformer

Online Message

invisibility? Click changeinvisibility?
Service
Contact

Hotline

+86-185-5293-9138

work shift

from Monday to Friday

Company phone

+86-185-5293-9138

QR code
Service